Avian produces coordinated Revit documentation in your practice template: views cut live from the model, dimensioned against real geometry and checked sheet by sheet before issue. Drafting is where a model becomes something a builder can price and build from.
Revit drafting services turn a parametric model into the coordinated sheet set people build from. Views are cut live from the model, so a plan, a section and a schedule all read from the same geometry and cannot quietly drift apart.
In line-based CAD, those three are independent files that someone has to keep in agreement by hand. Change a window head height in Revit and every affected view updates with it. The annotation still needs reviewing, but the geometry doesn’t.
Modelling builds the objects; drafting turns them into the drawings people build from. The two get quoted together and delivered together, and they consume different skills at different rates.
| Task | Modelling | Drafting |
|---|---|---|
| Walls, floors and roofs | ● | — |
| Family creation | ● | — |
| View creation and sheet setup | — | ● |
| Dimensioning and annotation | — | ● |
| Detail components and 2D detailing | — | ● |
| Schedule formatting and legends | Partial | ● |
Practices engaging Avian on Revit drafting outsourcing services use the same engagement models as the modelling service, and the mechanics are set out there: pricing basis, minimum commitment, ramp-up, data security and IP position.
Where the work needed is model authoring rather than documentation, Revit BIM modelling services covers the engagement structure in full. The wider range sits under BIM services.
| Attribute | AutoCAD drafting | Revit drafting |
|---|---|---|
| Source of geometry | Drawn line by line | Cut live from model objects |
| When design changes | Every affected sheet edited by hand | Views update; annotation reviewed |
| Coordination between sheets | Manual, and easily missed | Automatic for model-derived content |
| Schedule generation | Typed and maintained separately | Read from model parameters |
| Cost profile | Cheap to start, expensive to revise | Expensive to start, cheap to revise |
Every engagement is quoted against a sheet register agreed in writing. The table below shows what a set contains, what each part is produced from, and what we need from you to produce it.
| Component | Typical count | Produced from | Basis | Client input |
|---|---|---|---|---|
| Sheets | 12 to 80 | Model views placed and titled | Standard | Register, title block |
| Views | 4 to 8 per sheet | Live model cuts | Standard | View templates |
| Details | 15 to 120 | Model views plus 2D components | Standard | Existing detail library |
| Annotation | Per view | Authored over views | Standard | Text, dimension styles |
| Schedules | 3 to 12 | Model parameters | Standard | Required fields |
| Legends | 2 to 6 | Authored | Quoted | Symbol standard |
| Detail library | Per practice | Authored, reusable | Quoted | Existing standards |
Documentation depth changes across project stages, and what changes is the documentation. The same model supports an SD set and a CD set. What differs is how much gets drawn, dimensioned and detailed over it.
Yes, following a model audit. Most documentation engagements start from a client-supplied model rather than one Avian built, and the audit is what makes the process reliable.
The audit is a bounded step: half a day to two days depending on model size, quoted as a fixed fee and credited against the engagement if it proceeds. It produces a written report. Eight checks run, matching the criteria published on Avian’s Revit modelling service.
| # | Check | What it looks for | Blocks docs? |
|---|---|---|---|
| 01 | Warnings | Unresolved critical warnings and error volume | Yes, above threshold |
| 02 | Duplicate or overlapping geometry | Elements modelled twice, overlapping walls and slabs | Yes |
| 03 | Room bounding | Rooms that do not bound, or report no area | Yes |
| 04 | Level and grid integrity | Elements unassigned to a level, grids inconsistent across views | Yes |
| 05 | Workset structure | Elements on incorrect or default worksets | No, but logged |
| 06 | Family and type hygiene | In-place families, unused types, naming inconsistency | No, but logged |
| 07 | Shared coordinates | Coordinates round-trip correctly through export | Yes |
| 08 | File performance | File size and open times against practical working thresholds | No, but logged |
You get two quotes: remediate the model first, or document around the problems and accept the limitations in writing. Both are priced. Most providers quote only the larger path.
Seven stages from brief to issue. Stage 01 is the contract the fixed fee is quoted against, and it is the only cheap place to change scope.
Under every Revit drawing set is a dimension policy, and it decides whether the set can be trusted. Avian’s is simple: every dimension measures live model geometry, and no dimension value is ever overridden.
An override in Revit replaces what the model measures with whatever number someone typed. The sheet then shows a dimension that is no longer connected to the building. It is invisible on a printed PDF, it survives every revision round, and it is how volume documentation shops hit aggressive sheet rates.
When a dimension does not read as expected, the geometry has to be fixed rather than the number. That costs time, but it also means the number on the sheet is a precise measurement.
Revit drafting solutions are priced per sheet against an agreed register and documentation stage, because sheets are the unit the client is buying and the unit the register defines.
Documentation is produced by Australian-based drafters working in Australian time zones. Nothing is subcontracted offshore, which matters most during revision rounds, when a markup returned at 4 pm needs a conversation.
Documentation is the easier half to hand over. It is briefable against a register, it does not require design judgement week to week, and it absorbs the hours that keep senior staff off design work.
Practices engaging Avian on Revit drafting outsourcing services use the same engagement models as the modelling service: project-based against a fixed register, retained capacity drawn down monthly, or overflow support on short notice.
Where you need the model authored, Revit BIM modelling services covers that scope, and where documentation starts from a measured building, our scan to BIM service produces the verified model first.
Three buyer groups commission Revit drawing services for different reasons, and the register each one needs looks different even when the building is the same.
Practices documenting in AutoCAD are covered by CAD drafting services, and existing-building documentation from measured data by architectural drafting services.
Templates, supplied models, handovers and revisions. If yours is not here, ask us directly.
Yes, and we prefer it. Your template, title block, view templates, text and dimension styles are loaded before any view is placed. Authoring in your standard from the first sheet avoids the conversion pass at the end, which is where line weights and annotation scaling typically break.
We need the model the views are cut from. Linked consultant models are useful for coordination and cross-referencing but are not required. If you can only share a discipline model, we scope the register around what that model can support.
Yes. Most engagements start from a client-supplied model. An eight-check audit runs first, quoted as a fixed fee and credited against the project if it proceeds. You receive a written report and two quoted paths: remediate first, or document around the problems with the limitations stated.
Yes. Mid-project handovers start with the same audit plus a register reconciliation, matching what has been issued against what remains. Revision continuity is preserved, so numbering and the revision table carry forward rather than restarting under a new author.
Both. The native RVT, the PDF sheet set, the updated register and any details or legends authored for you are handed over at project close. There are no licence conditions and nothing is withheld to secure the next engagement.
Yes, where the model supports it. Fabrication-level sheets need LOD 400 content, so if the supplied model sits at LOD 300 the gap is quoted as modelling work before documentation starts.
Yes. The issued set is reconciled against what was built, with changes clouded and the register updated. Where the as-built condition needs measuring rather than taking from site markups, we capture it first and document against verified geometry.
Two rounds are included, covering markups returned within 14 days. Each round produces sequential revision numbering, clouds against changed areas, an updated revision table and a transmittal. Superseded issues are not overwritten but archived. Additional rounds are quoted transparently.